Detached ADU in DFW backyard

Detached ADUs

Detached ADU Builders
in Dallas–Fort Worth

A standalone structure, built from the ground up, on your property. Total design flexibility. One team from site plan to final walkthrough.

Typical cost: $100,000–$300,000+·Timeline: 5–9 months

A detached ADU is a standalone structure on your property — designed from scratch, built from the ground up, and completely separate from your main home. It's the most flexible option for homeowners who want a true independent living space on their lot.

Because it's a new build, a detached ADU gives you total control over the design: layout, size, placement on the lot, finishes, and how the space connects (or doesn't) to your primary home. It's also the best option for lots where the existing garage can't be converted or built upon.

Detached ADUs in DFW typically range from $100,000 to $300,000+ depending on size, design complexity, site conditions (slope, access, utility proximity), and finish level. Larger or premium builds can go higher, but most DFW projects fall in this range.

What Goes Into Building a Detached ADU

Site Survey & PlacementWe map your lot to determine the best location — factoring setbacks, utility lines, drainage, and views.
FoundationSlab or pier-and-beam depending on soil conditions and site characteristics.
Framing & StructureGround-up framing gives you full flexibility on ceiling heights, window placement, and layout.
Full MEP SystemsComplete mechanical, electrical, and plumbing for a fully independent unit.
Separate Utility ConnectionsMost cities require separate water, sewer, electrical, and gas for detached structures.
Exterior DesignMost DFW cities require the ADU to match or complement the main home's style.
Site RestorationLandscaping, drainage, and any disturbed yard areas restored after construction.
Detached ADU interior

Lot Requirements for a Detached ADU in DFW

CityMax SizeMin Lot SizeOwner-Occupancy
Fort WorthVaries by district6,000 sq ft typicalNot required
DallasPer ADUO overlayPer overlay districtNot required
MansfieldPer zoning codePer districtNot required
Aledo / Parker Co.Varies by jurisdictionLarger lots typicalNot required
Denton800 sq ft or 75%7,000 sq ftNot required
BurlesonPer zoning codePer districtNot required
ArlingtonPer zoning codePer districtCheck locally
SouthlakeLarger lots typical15,000+ sq ftNot required

All zoning details subject to change. We verify your specific address before design begins.

How Long Does It Take to Build a Detached ADU?

Design
4–8 weeks

Site survey, floor plan development, structural engineering, and material selections.

Permits
4–10 weeks

New construction takes longer to permit than conversions. City timelines vary significantly.

Construction
12–20 weeks

Site prep, foundation, framing, rough-in, exterior, and interior finish.

Total: 5–9 months from first conversation to final walkthrough.

Is a Detached ADU a Good Investment?

$1,600–$2,400/mo
Highest rental income of any ADU type
+12–20%
Typical property value increase
Highest ROI long-term
Biggest upfront cost, biggest long-term return

Detached ADUs command the highest rents of any ADU type because they offer the most privacy, the most independence, and the most amenities. The payback period is longer than a garage conversion, but the long-term return — in both rental income and property value — is the strongest of any ADU build type.

Detached ADU exterior view

Frequently Asked Questions About Detached ADUs

Ready to Build a Detached ADU?

Tell us about your lot and your goals — we'll give you an honest picture of what's possible.